

 |
PTF No.:T380B125
The progress is unknown while executing ALOGUBKS or ALOGLBKS. |

| REGISTERED DATE: |
2004/09/16 |
 |
| CATEGORY: |
Utility |
 |
| CONDITION: |
When a large number of job logs and/or SYSLOGs are present in the Datapool |
 |
| PROBLEM DESCRIPTION: |
When condition is met, it takes a long time to backup and/or reorganize Datapool with ALOGUBKS and ALOGLBKS utility. While the utilities are executing, the progress is unknown. |
 |
| TEMPORARY ACTION: |
None |
 |
| PROBLEM CONCLUSION: |
The programs are enhanced to display a progress message 'SDB031I nnnnnnnn PROCESSING OF mmmmmmmm REPORT WAS COMPLETED' for every 5000 job logs or SYSLOGs they have processed. |
 |
| PREREQUISITE PTF: |
T380B113 |
 |
| PROGRAM: |
BKSUDEL, BKSLDEL, MSGBKSL |
 |
| CATALOGED PROCEDURE: |
ALOGUBKS, ALOGLBKS |
 |
| NECESSARY ACTION: |
Link-edit using T380R125, and apply the PTF. Then execute ALOGUBKS or ALOGLBKS. |
 |
| AMENDING PTF: |
None |
 |

|
 |